A. analysis of process chart
B. flow of material
C. ordering schedule of job
D. controlling inventory costs money
E. all of the above
Advertisement
Related Mcqs:
- Work study is concerned with_________________?
- A. improving present method and finding standard time B. motivation of workers C. improving production capability D. improving production planning and control E. all of the above...
- The two-bin system is concerned with_________________?
- A. ordering procedure B. forecasting sales C. production planning D. despatching and expediting E. none of the above...
- Break-even analysis can be used for__________________?
- A. short run analysis B. long run analysis C. average of above two run analysis D. there is no such criterion E. none of the above...
- ‘Value’ for value engineering and analysis purposes is defined as_____________________?
- A. purchase value B. saleable value C. depreciated value D. present worth E. function/cost...
- Motion study involves analysis of________________?
- A. actions of operator B. layout of work place C. tooling and equipment D. all of the above E. none of the above...
- The technique of value analysis can be applied to____________________?
- A. complicated items only B. simple items only C. crash programmer items only D. cost consciousness items only E. any item...
- The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
- A. early finish B. early start C. late start D. late finish E. none of the above...
- In PERT analysis, critical path is obtained by joining events having___________________?
- A. +ve slack B. -ve slack C. zero sldck D. dummy activities E. critical activities...
- PERT analysis is based on____________________?
- A. optimistic time B. pessimistic time C. most likely time D. all of the above E. none of the above...
- Queuing theory deals with problems of________________?
- A. material handling B. reducing the waiting time or idle Jajme C. better utilization of man services D. effective use of machines E. none of the above....
Advertisement